Notice ID:FA5422-20-Q-7088
This requirement is for the placement of a 1,270 LM reinforced concrete T-wall perimeter topped with concertina wire for the Exercise Relief Facility (ERF) compound at AB101 in Niamey, Niger-Africa. T...
This requirement is for the placement of a 1,270 LM reinforced concrete T-wall perimeter topped with concertina wire for the Exercise Relief Facility (ERF) compound at AB101 in Niamey, Niger-Africa. The project also includes the installation of a new entry control point (ECP) with vehicle gate and drop arm, perimeter lighting, and ten defensive fighting positions (DFPs). Additionally, the project includes all required site preparation, demolition, and drainage work, as well as installation of the HESCO barriers. Questions are due: 11:00pm PST, 15 Sep 2020 Update: See attached labeled FA542220Q7088 - RFIs Update 2: See attached second round of RFIs and 2 photos