This project shall accomplish the repair of cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to stabilize structural columns with jacketing procedure and fill g...
This project shall accomplish the repair of cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to stabilize structural columns with jacketing procedure and fill gaps between concrete and wall interfaces. Replace all the plumbing items under the slab, fire suppression system, fire alarm system and jammed doors. Install ceiling tiles and suspension system as determined by the construction planning stage. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Replace electrical and other fixtures to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose of Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose of waste materials as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.