Inactive
Notice ID:FA527023R0007
Work includes but is not limited to pre-installation inspection, gathering of relevant site data, and review of existing drawings and radon sampling data. Determine size, location, and configuration o...
Work includes but is not limited to pre-installation inspection, gathering of relevant site data, and review of existing drawings and radon sampling data. Determine size, location, and configuration of radon mitigation systems to continuously maintain radon levels under 4 picocuries per liter (pCi/L) for the housing unit. INSTALLATION: New system shall be completed using active soil depressurization (ASD) techniques and employ sub-slab depressurization (SSD) methods. All installed exterior hardware and components shall be corrosion resistant suitable for coastal marine environments. Provide electrical wire from new suction fan to existing circuit breaker panel board. New interior conduit shall run above ceiling as much as possible. Please Note: The Attachments below are only avaible upon request. The attchements will be sent via DOD SAFE, or a CD may be picked up in person from the contracting office. - 11. 23R0007 As-Built, SQF4-89, CCPAIP6-338Y-CC-AE-103FP.dwg - 12. 23R0007 As-Built, SQF4-89, CCPAIP6-338YC-CC-CD101-CC.dwg