36LRS SOIL REMOVAL
The contractor will provide all labor, supervision, equipment, materials, tools, transportation, packaging, sampling, laboratory analysis, and disposal services to remediate residual petroleum-impacted soil and remove fuel-contaminated wastewater at the 36th Logistics Readiness Squadron POL Compound, Andersen Air Force Base, Guam. Work addresses contamination from a fuel release near Building 26200/Pumphouse 1 Generator and the Product Recovery Tank at Pumphouse 1. The objective is to excavate and remove fuel-impacted soils to cleanup goals, package, transport, and dispose of all generated soil and liquid waste, confirm cleanup standards through laboratory analysis, and restore the excavated area to surrounding grade and pre-existing conditions. All work must minimize disruption to flight operations and base activities. Amendment 0001 requires removal of up to 900 gallons of fuel-contaminated wastewater/product from the Product Recovery Tank plus 600 gallons from a Fuel Bowser, approximately 1,500 gallons total, and Amendment 0002 removed the Period of Performance from the SOW.