KPSFS Power Plant Automatic Control System

Notice ID:FA521526P0020

Kaena Point Space Force Station requires specialized engineering labor, troubleshooting, and software repair services for its failed Power Plant Automatic Control System (ACS). The contractor will assess, test, evaluate, troubleshoot, and repair the localized closed-loop logic controller that operates the installation’s emergency automatic control system. The repaired system must achieve automated outage sensing and transition critical loads to backup generators within approximately 30 seconds of a commercial grid failure. Testing must be non-destructive to preserve the integrity of existing generator switch gears and breakers. Performance will take place at Kaena Point Space Force Station.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA5215 766 ESS PKP
  PSC   J059 MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS
LOCATION: Not Given
Primary Contact
A1C Michael R. Perreira
808-***-3167
Alt Contact
SrA Kyle Bristow
808-***-3136

Links (0)

Attachments (1)


Data sourced from SAM.gov. View Official Posting »