Carbon Filter Pellet Removal and Replacement- Amendment 3
The work is for the 3rd Maintenance Squadron at Joint Base Elmendorf-Richardson (JBER), AK, covering carbon filter media replacement at two facilities: Building 6263 with 440 filters across three paint booths, and Building 9696 with 792 filters across four aircraft bays. The contractor must deliver and install 34,000 lbs of 4mm carbon pellets, remove and dispose of spent carbon per regulations, and follow OEM installation instructions. All labor, materials, equipment, and specialized tools required for the bulk carbon exchange must be furnished by the contractor.