Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA500021R0042001
Amendment 0004 (Posted 15 July). This amendment removed verbiage stating bid bonds were required. Bid bonds are not required for this project. Amendment 003 (Posted 12 July): This amendment provides t...
Amendment 0004 (Posted 15 July). This amendment removed verbiage stating bid bonds were required. Bid bonds are not required for this project. Amendment 003 (Posted 12 July): This amendment provides the answers to site visit questions, the site visit sign-in sheet, and revised SPECS and drawings. Amendment 0002 (Posted 8 July): This amendment shortens the response due date from 26 July to 16 July. FXSB 19-5239 Government Hill Gate: This project will add traffic calming chicanes and speed tables to increase base security and safety. Work associated with the chicanes includes construction surveying, pavement removal, excavation, rebuilding part of roadway structural section, paving, placing new curb and gutter, placing boulders and jersey barriers, and signing and striping. Work also includes final grading of chicanes and design of roadway drainage/storm drain system. FXSB 19-5240 Post Road Gate: This project will add traffic calming chicanes to increase base security and safety. Work associated with the chicanes includes construction surveying, pavement removal, paving, placing new curb and gutter, placing boulders and signing and striping. Work also includes final grading of chicanes and design of roadway drainage. Please see the attached Statement of Work for more information.