Luke AFB Well Maintenance
Luke AFB, Arizona requires well maintenance services. The contractor must furnish all labor, materials, heavy rigging, and engineering supervision to extract, overhaul, and reinstall one deep well turbine pump set at approximately 560 feet. The work includes rebuilding a 150 HP surface motor, overhauling the bowl assembly to achieve 1050 GPM at 580 feet total dynamic head, rehabilitating an 18-inch wellbore, and commissioning the system to Air Force standards. Funds are not presently available, so no award will be made until funding is secured, and the government may cancel the solicitation.
Links (0)
Attachments (22)
Data sourced from SAM.gov.
View Official Posting »