Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA487720QA180
THIS IS A TIME SENSATIVE REQUIREMENT TO ENSURE PROJECT COMPLETION: The objective of this project is to remove remove and conduct preliminary site characterization of two (2) underground storage tanks ...
THIS IS A TIME SENSATIVE REQUIREMENT TO ENSURE PROJECT COMPLETION: The objective of this project is to remove remove and conduct preliminary site characterization of two (2) underground storage tanks (USTs) at building 7222, located on the 309th Aerospace Maintenance and Regeneration Group (AMARG) on Davis-Monthan Air Force Base, in Tucson, Arizona. These 5,000 gallon steel gasoline tanks have been determined to be excess and to the best of the Government's knowledge these tanks are not leaking. 1. This is a 100% Set-Aside for Small Business 2. All work shall be performed in accordance with the attached Statement of Work. 3. Project Magnitude: $25,000 - $100,000 4. Proposals must be received via e-mail no later than 10:00 AM on 26 March 2020. 5. Proposals must be valid for 30 days. 6. Proposals must include the attached Standard Form 1442 and Section B. 7. Point of Contact (POC) is as follows: Rachelle Jenkins, Contract Specialist - (520) 228-3095; email: rachelle.jenkins.3@us.af.mil or the Contracting Officer - Breysi Stephens - (520) 228-3598; email: breysi.stephens@us.af.mil 8. Questions are to be submitted via email only to the POC no later than 10:00 AM on 17 March 2020 9. Award will be based on a lowest price technically acceptable process.