26 WPS - WT15754265 - Mini Split Upgrade
The contractor will construct two maintenance pads for condensing units, install a two-sided CMU screen block wall matching existing style, and provide weatherproof receptacles and disconnects. New cassette HVAC systems will be installed in Rooms 112, 113, 114, and 132 with specified tonnages and separate controllers, along with associated electrical, conduit, insulation, and generator backup work at Building 119. All work must comply with applicable codes and standards including IBC, UFC, DOD instructions, and Clark County, Nevada requirements. The period of performance is 160 days, with a site visit scheduled for 8/4/2026 at 0830 AM PDT in front of Building 119's main entrance. Performance location is Nellis AFB in Nevada, and proposals will be evaluated using lowest price, technically acceptable.