Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:FA485523AS002
Since BLDG 550 does not have an automatic sprinkler system, the cooking area requires a suppression system over the oven and stove area. The existing systems PCU board is unresponsive to any signals u...
Since BLDG 550 does not have an automatic sprinkler system, the cooking area requires a suppression system over the oven and stove area. The existing systems PCU board is unresponsive to any signals upon activation of building fire alarm system and any electrical shunt trips. Purchase and install a new DELNAR D1030-F 30" (Brand Name) hood or equal product along with a New Charged Tank. Once system is installed, a full test will be performed to verify proper function of hood system. PoP: Installation within 30 calendar days from the contract effective date. Questions Due Date: 23 June 2023