Pop-up Target System
The contractor must supply 19 new battery-powered pop-up targets, a wireless network with a minimum two-mile range, and a comprehensive remote-control system, including tablets and handheld controllers. The system must provide accurate scoring, lighting control, and real-time battery monitoring from the range tower. Upgrade options are required to integrate the new system with existing ATA pop-up targets and chassis. Performance of services is at the Grand Bay Range in Valdosta, GA, with a site visit scheduled for 01 July 2026. Comprehensive maintenance and operations training for Grand Bay Range personnel is also required.