Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA483024Q0060
UPDATE: OFFER DUE DATES ARE PUSHED BACK. SEE COMBO FOR MORE INFO Moody AFB is looking to replace the existing wash rack station we have. Details are below. -10'W (Entrance) x 20'L x 13'H (Dimensions) ...
UPDATE: OFFER DUE DATES ARE PUSHED BACK. SEE COMBO FOR MORE INFO Moody AFB is looking to replace the existing wash rack station we have. Details are below. -10'W (Entrance) x 20'L x 13'H (Dimensions) -Ability to be integrated with an existing in-ground sump -Cleaning Detergent used: Clean Compound Aerospace Equipment MIL-PRF-87937 -Equipment to be washed: Munitions trailers MHU-141, MHU -110, MHU-226 -Ability to spray wash with cleaner to effectively remove dirt/debris/grease/heavy oils/carbon deposits. -Protective system to protect the critical components of this vehicle wash rack -Must have a water/oil/particulate collection and separation tank Q&A Please take a look at PDF attachment 6. Site Drawings for answers 1. Are their drawings that would show existing UG utilities and storm drains-General Statement notes “Ability to be integrated with an existing in-ground sump” // See PDF Attachment 6 // 2. What size is electrical service stubbed up at pad // See PDF Attachment 6// Voltage 277/480 // 3. Where does water drain currently when dumped into grates // The water that goes into the grates ends in the sump. The sump does not drain.// 4. What water service is available // See PDF Attachment 6// ¾’’ water pipe // 5. Do you want the option to have hot water // Not mandatory // Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. FAR 52.212-2 Evaluation - The following factors shall be used to evaluate offers: item technical capability, lowest price technically acceptable, and past performance. Disregard "this provision has been tailored to this procurement and is provided via attachment to this Solicitation.", as seen below.