Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA481920Q02JL
AFCEC/CEMIRT has a requirement for the design, manufacture and installation of a free standing Overhead Bridge Crane System for manipulating large equipment assets. Vendor must meet the minimum specif...
AFCEC/CEMIRT has a requirement for the design, manufacture and installation of a free standing Overhead Bridge Crane System for manipulating large equipment assets. Vendor must meet the minimum specifications referenced in the Statement of Work and Combined Synopsis Solicitation. The requirement is a total small business set-aside. A site visit has been scheduled for this requirement on 22 June 2020. For more information on the site visit, view the attached Conbined Synopsis Solicitation and Site Visit Agenda.