Repair Fire Hydrants / Valves
This opportunity is a 100% Small Business set-aside for repairing fire hydrants and valves at Shaw AFB. The magnitude of construction is between $250,000 and $500,000. The period of performance is not to exceed 141 days after issuance of the Notice to Proceed. A mandatory site visit was already held, and attendance was required for proposal submission. All proposals must be submitted by 12 August 2026 at 9:00 A.M. EDT.