Repair MWD Kennel Interior, Facility 1030 at Joint Base Langley - Eustis (JBLE), VA
This project involves the complete replacement of an HVAC system and the improvement of kennel cells at Langley AFB to meet design standards, addressing odor and health concerns by installing a Dedicated Outside Air System (DOAS) and necessary three-phase power. The estimated budget for construction is between $1,000,000 and $5,000,000. All work is to be performed at Langley AFB. Foreign participation is not authorized for this requirement.