Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA4800-22-Q-A036
• The Contractor will deliver, replace and install two basketball goal systems to include the following: backboard, rim, net, extension arm, post/poles (if needed). • The Contractor will repaint the o...
• The Contractor will deliver, replace and install two basketball goal systems to include the following: backboard, rim, net, extension arm, post/poles (if needed). • The Contractor will repaint the outdoor basketball court to a smooth surface leaving no cracks. Must ensure materials are durable and weather resistant. Cracks must be routed, cleaned and sealed then court surface cleaned, prepped & an outdoor court coating re-applied followed by repainting of the boundary, free throw, lane/key, mid-court & three point arc lines & hash marks • The Contractor will refurbish both lighting fixtures surrounding the court by adding timer switches or provide other lighting options with contractor's experience. • Contractor will paint gooseneck posts black & install new, non-adjustable backboard extension arms (paint/powder coat to match posts) & stainless hardware, Plexiglas backboard w/shooter's square & heavy-duty recreation flex goal.