Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA466123Q0100
The contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly install polyurethane spray foam insulation in the roof of Building 9001. The ...
The contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly install polyurethane spray foam insulation in the roof of Building 9001. The existing sloped roof is built on top of a flat roof, therefore there are framing members in a grid approximately 2 ft apart. The aforementioned information along with interest and capability statements are requested to be provided no later than 17 April 2023 at 1000 CST. The information that is received from this RFI will be used to make the best decision on how to proceed with this acquisition. All information will be kept within the 7th Contracting Squadron, and will not be shared with any other potential offerors. If you have any additional questions or concerns, please contact Kasey Hutton at kasey.hutton.1@us.af.mil (Phone: 325-696-3862). Attachments: 1. ROOFING INSULATION RFI 2. ROOF INSULATION 9001 SOW