Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA4661-21-Q-0027
The work covered by this project consists of the contractor furnishing all layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supp...
The work covered by this project consists of the contractor furnishing all layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals and of performing all operations in connection with the runway rubber removal and airfield markings. All work will be performed at Dyess AFB, Texas - complete and in strict accordance with the plans and specifications. Work will be released to contractor in work packages via individual task orders.The government reserves the right to utilize in house forces to accomplish work on base pavements. 1- The contractor shall perform rubber removal per specification at runways 16/34 and 164/344. Two rubber removals are required for runway 16/34 and one for runway 164/344. Refer to attached drawings and phasing requirements. 2- Paint airfield markings as indicated in attached drawings C1 through C3 following contract specifications. Refer to attached phasing requirements.