Comms Installation of Power Whips for Server Rack Power Feeds
The 434th Contracting Squadron at Grissom AFB, IN, requires a contractor to install six dedicated electrical circuits in Buildings 427 and 671, including four 240V/208V 30A and two 125V 15A circuits, to support new server and communications equipment. Performance is scheduled from September 1, 2026, to September 30, 2026. A mandatory site visit is required on July 30, 2026, at Grissom AFB, and failure to attend will disqualify your quote. Contractors must have an active CMMC Level 2 (or equivalent) assessment posted in SPRS to be eligible for award. Funds are not currently available, but the government anticipates they will become available before award.