PREMISE WIRING B145
This is a project to engineer, furnish, install, and test a complete premises wiring upgrade to new plenum-rated Cat-6 and OM4 fiber cabling in Building 145 at Malmstrom AFB, Montana. The work includes replacing communications racks, installing new AC power with PDUs, and removing all existing outdated cabling for disposal. A site visit is scheduled for April 7th, 2026, at the specified building address on the base. The project involves a phased plan, with approximately 90% of the work being removal and replacement of existing drops and 10% involving installing new drops. The contractor will be responsible for terminating cables to patch panels.