B1825 LIGHTNING PROTECTION SYSTEM
This requirement is for a lightning protection system upgrade and inspection, including labor, materials, and equipment. The work involves upsizing cables to AWG 4/0 copper and replacing some frayed cable, with the inspection compliant with NFPA 780. The contractor must deliver a hard copy and digital CD of test results and a UL Inspection Certificate certified to NFPA 780 Chapter 8. A key requirement is that the contractor must have completed Senior Inspector AMMO 47 or equivalent training.