Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA4626-22-R-0002
This work will be performed at remote Launch Facility (LF) located 100+ from the support base. Work will consist of the installing a new interceptor trench, geodrain and toe drain, and discharge lines...
This work will be performed at remote Launch Facility (LF) located 100+ from the support base. Work will consist of the installing a new interceptor trench, geodrain and toe drain, and discharge lines, connecting new drains to the existing sump pump discharge lines, and abandoning old monitoring wells. The contractor shall provide all plant, labor, equipment, supervision, services, and materials to execute and satisfy the requirements.