Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA4626-22-Q-0019
The contractor shall “provide all labor, equipment and materials to remove old and install new (4) 1-foot sections of boiler tubes from #2 Generator front wall of combustion chamber. Inspect and have ...
The contractor shall “provide all labor, equipment and materials to remove old and install new (4) 1-foot sections of boiler tubes from #2 Generator front wall of combustion chamber. Inspect and have a lab analysis done on (4) old boiler tubes for excessive overheating. Contractor shall dispose of all materials removed during repair. Contractor shall provide all documentation and inspections required by State and Federal requirements.