Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA462523Q1094
Contractor shall disconnect well piping and power to well motor for Well 5 & 6. Once removed, contractor will perform televised underground survey to verify integrity of well casing and borehole, any ...
Contractor shall disconnect well piping and power to well motor for Well 5 & 6. Once removed, contractor will perform televised underground survey to verify integrity of well casing and borehole, any issues will be brought to the government’s attention. Contractor will then reinstall new motor, well pump, and domestic galvanized drope pipe. Also installed will be two stainless steel Flomatic check valves with stainless steel nipples and couplings. New Flat Jacket wire will be installed along with new airline and gauge for calculation pumping and static water levels. Once the well pumps are reinstalled the contractor will perform a pump test and provide the results to the government on a Pumping Test Data Sheet. Contractor shall ensure no contaminants are introduced into the well during their repairs and will remove and discard old piping, pump/motor and any other debris from site. Please see full solicitations details at detachments.