Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA462124Q0063
The Contractor shall perform all maintenance required by the Component Maintenance Manual (CMM) to return the KC-46 Smoke Barrier to a serviceable condition, and any deviations from the CMM must be ap...
The Contractor shall perform all maintenance required by the Component Maintenance Manual (CMM) to return the KC-46 Smoke Barrier to a serviceable condition, and any deviations from the CMM must be approved through the 107 process outlined in section C.2.0 of the SOW. In order to ensure all materials are Federal Aviation Administration (FAA) compliant, McConnell shall provide all required materials for repair and will transport Smoke Barriers requiring repair to and from the repair facility, with repair to be verified on site by McConnell Quality Assurance (QA) member or a QA designated representative. The Contractor must be a certified FAA Part 145 Repair Station.