Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA462025QA920
The Contractor shall provide all consumable materials, specialized tools and qualified labor to integrate the URC 300 Air to Ground radio with rack in building 2040. Installation will be conducted in ...
The Contractor shall provide all consumable materials, specialized tools and qualified labor to integrate the URC 300 Air to Ground radio with rack in building 2040. Installation will be conducted in a manner that will ensure serviceability and prevent deterioration in operational effectiveness of the URC 300 Air to Ground radio. The Contractor shall comply with the Statement of Work (SOW) and local, state, and federal guidelines as applicable to the work involved. Ammendment 0001 has been posted.