Vandenberg Structural Engineering Study, SLC-3 Tower

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA461026Q9994

This solicitation seeks a third-party engineering firm to conduct a limited structural condition assessment of the 156-foot SLC-3 Tower at Vandenberg Space Force Base. The work involves a physical field survey, nondestructive testing, structural analysis, and a final report stamped by a California-licensed structural engineer. The draft report is due 30 days after award, and the final report is due 90 days after receiving government comments. Performance will occur at Vandenberg SFB.