Gate Valve Frame Replacement
The requirement is to replace two rusted vertical frame pieces and one horizontal brace on an existing gate valve assembly. The contractor must temporarily remove the electric motor-driven actuator and retained top headrail, unbolt the frame from its lower concrete headwall connection, field-drill bolt holes to align and secure the headrail to the new vertical components, and reassemble the structure per original manufacturer specifications. After reinstallation, the contractor must verify the gate valve is fully operational, travels freely without obstruction, and seals properly when fully closed. The contractor must provide all logistics, labor, tools, and lawful disposal of materials and removed components in accordance with Attachment 1, Statement of Work dated 01 Sep 2026.