Relocation and Calibration of Mobile Space Saver Racking System
FA4600_Warehouse_Transition
The contractor must disassemble, transport, and reassemble a high-density mobile storage system from Building 301D to Building 504. The work involves inventorying components, removing drawers, and dismantling shelving and a three-rail track system before transport. At the new location, the contractor must reinstall and level the track system, reconstruct the shelving, reinstall the drawers, and ensure the sliding mechanism works properly. The final requirement is to dispose of all packing materials and debris from both sites. The system footprint is approximately 19' x 19' x 8.5'.