55 FSS TACFIT Flooring
The work is replacement and removal of un-level multi-surface flooring in the TACFIT area of the Offutt AFB Fieldhouse. The PWS was updated to increase flooring thickness to 3/4 inch, and site-visit photos and vendor Q&A answers were posted; a prior update removed the mandatory pre-award site visit. A site visit is scheduled for Monday, 14 September at 1300 CT, with EAL forms requiring specific attendee information and due to the listed POCs by COB 7 September 2026; base access is not guaranteed. Questions must be emailed to the Contracting Office by 16 September 2026 at 1100 CT, and answers will be posted via amendment to SAM.gov.
55 FSS TACFIT Flooring
The work is removal and replacement of un-level multi-surface flooring in the TACFIT area of the Offutt AFB Fieldhouse. The latest amendment updates the PWS to increase flooring thickness to 3/4 inch and posts site-visit photos and vendor Q&A answers. A prior amendment removed the mandatory pre-award site visit, and a site visit was held on Monday, 14 September at 1300 CT. Attendees had to request and return an EAL form with personal identification and citizenship details, and base access was not guaranteed. Questions must be emailed in writing to the Contracting Office, with answers posted via amendment to SAM.gov.
55 FSS TACFIT Flooring
This opportunity involves the removal and replacement of an un-level multi-surface flooring in the TACFIT area of the Offutt AFB Fieldhouse. A site visit is scheduled for Monday, September 14, at 1:00 PM CST, requiring prior EAL form submission for base access. Questions must be submitted in writing by September 16 at
55 FSS TACFIT Flooring
Work involves replacement and removal of an un-level multi-surface flooring in the TACFIT area of the Offutt AFB Fieldhouse. A site visit is scheduled for Monday, September 14 at 1430 CST, and requires a completed EAL form returned by close of business September 7, 2026. Base access is not guaranteed. The performance location is the Offutt AFB Fieldhouse.
55 FSS TACFIT Flooring
This project requires the removal and replacement of un-level multi-surface flooring in the TACFIT area of the Offutt AFB Fieldhouse. A site visit is scheduled for Monday, 14 September at 1300 CST. To attend, contractors must request and return an EAL form to the listed POCs by COB 7 September 2026, though base access is not guaranteed. Written questions must be submitted to the Contracting Office by 16 September 2026. Work will be performed at Offutt AFB.
55 FSS TACFIT Flooring
The contractor must remove and replace an un-level multi-surface flooring in the TACFIT area of the Offutt AFB Fieldhouse. A site visit is scheduled for Monday, 14 September at 1430 CST, with an EAL form due by COB 7 September 2026; base access is not guaranteed. Questions must be submitted in writing by 16 September 2026 at 1100 CST. Performance will occur at the Offutt AFB Fieldhouse.