55 FSS Basketball Court Resurface

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA460026Q0088

Basketball court 4 is severely damaged, the protective coating peeling and stripping in many places, leaving the court unsafe for play and PFA execution. Provide necessary labor to resurfacing, retrof...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA4600 55 CONS PKP
  PSC   REPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING)
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »

55 FSS Basketball Court Resurface

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA460026Q0088

The contract involves repairing and resurfacing Basketball Court 4, whose protective coating is peeling and stripping, making it unsafe. The work includes retrofitting the existing court with in-floor net sleeves. A site visit is scheduled for Monday, 14 September at 1300 CST. Base access is not guaranteed for the site visit.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA4600 55 CONS PKP
  PSC   Z2PA REPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING)


Data sourced from SAM.gov. View Official Posting »

55 FSS Basketball Court Resurface

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA460026Q0088

The work involves resurfacing a severely damaged basketball court and retrofitting it with in-floor net sleeves to make it safe for play. A site visit is scheduled for Monday, 14 September at 1300 CST, with an EAL form required by COB 7 September 2026. Base access is not guaranteed for the visit. No budget or performance location is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA4600 55 CONS PKP
  PSC   Z2PA REPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING)


Data sourced from SAM.gov. View Official Posting »

55 FSS Basketball Court Resurface

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA460026Q0088

Basketball court 4 is severely damaged, the protective coating peeling and stripping in many places, leaving the court unsafe for play and PFA execution. Provide necessary labor to resurfacing, retrof...