Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:FA460021R0011
In 2019, Offutt AFB suffered a historic flood causing irreparable damage to 137 facilities. The damaged facilities were those housing critical capabilities for the execution and protection of nuclear ...
In 2019, Offutt AFB suffered a historic flood causing irreparable damage to 137 facilities. The damaged facilities were those housing critical capabilities for the execution and protection of nuclear command, control, and communications (NC3); and intelligence, surveillance, and reconnaissance (ISR) missions. Post-flood assessments determined the 1.2M square feet of workspace was not salvageable and requires demolition and rebuild. This requirement consists of providing Entry Control Point (ECP) support monitoring for the rebuild construction zone located on Offutt AFB during the demolition phase. This contract is contemplated to be a Firm Fixed Price (FFP) contract with a period performance of a 12-month base period and four 3-month options. This requirement shall be performed IAW the terms and conditions set forth in the 55th Wing Construction Entry Control Point Support Performance Work Statement (PWS) dated 27 April 2021 and the contract. Please reference the attached documents for additional information. Amendment 01: * * * Please reference the updated Combined Synopsis and Solicitation titled "FA460021R0011 Amendment 01 Combined Synopsis and Solicitation." This amendment removed language referencing Past Performance will be considered in IAW DFARS 213.106-2 and updated the proposal due date from 16 July 2021 to 23 July 2021. Please submit all proposals in accordance with the FA460021R0011 Amendment 01 Combined Synopsis and Solicitation. Amendment 02: ***Please reference the updated Combined Synopsis and Solicitation titled "FA460021R0011 Amendment 01 Combined Synopsis and Solicitation". This amendment updated the date of the Performance Work Statement (PWS) from 27 April 2021 to 07 July 2021 due to a PWS update. For PWS language being removed, this will be indicated with a strikethrough. For PWS language being added, this will be indicated by the yellow highlight. Please submit all proposals in accorance with the FA460021R0011 Amendment 02 Combined Synopsis and Solicitation and the updated 55th Wing Construction Entry Control Point Support PWS_07Jul2021. ***Solicitation Questions and Answers have been posted. Please refer to the excel Questions and Answers document with answers to questions received during the question submission time period. Amendment 03: ***Solicitation Additional Questions and Answers have been posted. Please refer to the excel Questions and Answers document with answers to questions received. Amendment 04: ***Please reference the updated Combined Synopsis and Solicitation tilted “FA460021R0011 Amendment 04 Combined Synopsis and Solicitation”. The amendment updated the following: estimated start date; updated CLIN language for Item No. 0001, 0002, 1001, 1002, 2001, 2002, 3001, 3002, 4001, and 4002; extended proposal due date; updated the proposal and pricing valid through date, and added clause FAR 52.232-18 Availability of Funds. All updates are highlighted in yellow. Please submit all proposals or proposal revisions in accordance with the FA460021R0011 Amendment 04 Combined Synopsis and Solicitation. Reminder: Management Plans must address personnel, equipment, and compliance IAW the 55th Wing Construction Entry Control Point Support PWS dated 07 July 2021. Proposals and pricing shall be valid through January 31st, 2022.