Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA452819QLB01A
For this requirement the Contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all work in accordance with the specifications of the Statement of Work (25...
For this requirement the Contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all work in accordance with the specifications of the Statement of Work (25 Apr 19). Work includes leveling of the existing floor to support the shelving structure and installation of the mobile/static shelves to include leveled rail and deck with garage mat deck cover, and dual control and access ramps.