Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA4528-21-Q-0002
Minot AFB, ND requires the removal and replacement of the current headliners and installation of new wall coverings in Two (2) Launch Control Centers (LCC). The project consists of removal of existing...
Minot AFB, ND requires the removal and replacement of the current headliners and installation of new wall coverings in Two (2) Launch Control Centers (LCC). The project consists of removal of existing headliner material, cleaning areas under existing headliner, and fabrication and installation of new ceiling coverings in LCCs (Launch Control Center) at two (2) MAFs (Missile Alert Facility). This project also consists of demolition, removal and installation of acoustical wall and ceiling coverings, and privacy curtains in LCC's D-01 and F-0. A Site Visit will be conducted on 6 January 2021 at 1000, see attachment II - Site Visit, for details.