Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA4497DropArm
The contractor shall provide all management, tools, materials, equipment and labor necessary to repair K4 Barrier & Re-Installation and dispose of all K4 barrier damage parts. The contractor shall tes...
The contractor shall provide all management, tools, materials, equipment and labor necessary to repair K4 Barrier & Re-Installation and dispose of all K4 barrier damage parts. The contractor shall test and calibrate the K4 Barrier to factory specifications. K4 barrier needs to work on current electrical setup of 208 VAC, 3 phase, 20 Amp. In addition, it will need to be hooked up to current control panels. K4 Crash Beam Repair/Replaced & Installation. Replace damage internal part with original Parts. Removal and disposal of all damaged parts. Freight cost to Dover AFB, DE.