Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA449721R0026
The contractor shall provide all design, labor, materials, tools, and equipment necessary to create a conference room within the footprint currently occupied by the Delaware Resident Office. Construct...
The contractor shall provide all design, labor, materials, tools, and equipment necessary to create a conference room within the footprint currently occupied by the Delaware Resident Office. Construct approximately 12 LF of walls, alter approximately 4 LF of walls, replace approximately 300 SF of flooring, and paint as needed. The contractor shall ensure the protection of existing areas and fixtures. All work, as specified in the scope of work and the drawings, shall meet or exceed the NEC (National Electrical Code) requirements, and UFC (Unified Facilities Criteria) requirements. Site Visit: 24 Aug 21 at 10:00 AM; Dover AFB Comercial Gate