Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA449720R0011
The Contractor shall provide all design, labor, materials, tools, and equipment to replace the roof snow retention system, one (1) chiller, a seven (7) story elevator, and repair tower HVAC components...
The Contractor shall provide all design, labor, materials, tools, and equipment to replace the roof snow retention system, one (1) chiller, a seven (7) story elevator, and repair tower HVAC components at building 502 in accordance with the Statement of Work (SOW). For a detailed description of the project scope of work see solicitation Attachment 1, SOW Repair B502 HVAC, Elevator, and Roof dated 6 November 2019.Work shall be accomplished in accordance with the Solicitation and all attached documents. **Review Amendment dated 26 March 2020 to see site visit changes. *** Teleconference Minutes and As-Builts uploaded 7 April 2020. Ensure you download As-Builts Part 1-4. ***Review Amendment dated 13 April 2020, to include attachments 9,10,11. The proposal due date has been extended to Monday, 20 April 2020.