Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA4497-25R-AirfieldPavementPreventativeMaintenance
The 436th Contracting Squadron, Dover AFB, DE, is contemplating an AIRFIELD PAVEMENT PREVENTATIVE MAINTENANCE requirements contract which consists of, but is not limited to: Crack seal 30,000 LF of as...
The 436th Contracting Squadron, Dover AFB, DE, is contemplating an AIRFIELD PAVEMENT PREVENTATIVE MAINTENANCE requirements contract which consists of, but is not limited to: Crack seal 30,000 LF of asphalt pavement Provide and install 4146 LF preformed elastomeric joint seal Repair defective manhole structures/covers Excavate, as necessary, to support other repair tasks. Repair 1000 SF-IN of concrete spalls Pave with 2 inches of FAA Mix using up to 5 Tons FAA Mix (PG 76-22 binder). Reseed areas disturbed by earthwork excavation. The base contract magnitude is between $250,000 and $500,000