Amendment 0002 issed 12 March 2024. Amendment 0001 issued 28 February 2024. The Contractor shall inspect and repair, if needed, during initial phase, to bring all Uninterruptable Power Supply (UPS) li...
Amendment 0002 issed 12 March 2024. Amendment 0001 issued 28 February 2024. The Contractor shall inspect and repair, if needed, during initial phase, to bring all Uninterruptable Power Supply (UPS) listed in Appendix C in manufacture operating conditions. After the initial phase, the contract shall provide preventive and remedial maintenance services on all UPS units listed in Appendix C. The equipment and associated bateries shall be kept in manufacturing operating condition and shall be maintained in accordance with the Original Equipment Manufacturers (OEM) maintenance specifications and schedules.