Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA445224R0005
SEE STATEMENT OF WORK FOR FULL DESCRIPTION. Furnish all Architecture and Engineering services, labor, material, equipment, incidentals, supervision, and transportation for work necessary to Repair Fac...
SEE STATEMENT OF WORK FOR FULL DESCRIPTION. Furnish all Architecture and Engineering services, labor, material, equipment, incidentals, supervision, and transportation for work necessary to Repair Facility Interior, 771. All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and UFC 1-200-01 and UFC 1-200-02. Work performed under this task order shall comply with the latest edition of all required publications, Federal, Department of the Army, State of North Carolina, and Fort Liberty construction safety and environmental protection laws, regulations, rules, and codes (i.e. American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), ASTM International (ASTM), U.S. Department of Defense (DOD), U.S. Environmental Protection Agency (EPA), etc.) and the Fort Liberty Installation Design Guide (IDG), dated at the time of the task order award. When a required publication is not specifically referenced in the contract, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.