Inactive
Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Notice ID:FA442720R0014
The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the task to repair the Combat Arms Training an...
The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the task to repair the Combat Arms Training and Marksmanship (CATM) facility (i.e. B1370) to comply with Air Force Engineering Technical Letter (ETL) 11-18. Contractor shall make repairs to the facility in compliance with the completed design documents. Repairs include, but are not limited to: - Remove framed exterior walls behind the ready line - Construct new control booth - Construct low wall at ready line perimeter - Replace electrical panel and lighting