Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA441724Q0001
30 Nov 23: Added Toxicity Characteristic Leaching Procedure Analysis Report (January 2023). 27 Nov 23: Questions and answers added to RFQ. The Contractor shall furnish all vehicles, trailers, containe...
30 Nov 23: Added Toxicity Characteristic Leaching Procedure Analysis Report (January 2023). 27 Nov 23: Questions and answers added to RFQ. The Contractor shall furnish all vehicles, trailers, containers, tools, equipment, parts, materials, supplies and labor for the loading, handling, transportation, unloading and disposal of residual (sludge) generated at Hurlburt Field’s Advanced Wastewater Treatment Facility (HFAWWTF)(Building 91500). The vehicles shall be in working conditions to prevent the spillage of vehicle fluids and the containers shall be structurally sound to prevent the spillage of residuals (sludge) onto concrete/asphalt area. The containers for residual collection shall meet industry standards and shall be a minimum 25 cubic yard container (current working containers 20’L x 8’W x 4’D)