Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA403022Q0024
23 CONS, Moody AFB is looking to acquire an Aerial Drone to perform Intelligence, Surveillance and Reconnaissance (ISR) missions. Due to the nature of this requirement we are limited on a single speci...
23 CONS, Moody AFB is looking to acquire an Aerial Drone to perform Intelligence, Surveillance and Reconnaissance (ISR) missions. Due to the nature of this requirement we are limited on a single specific option. We require a 'FLIR R80D SkyRaider'. Although the "NOTAM 2019-11-001" letter calls out for an additional option "PSI InstantEye", the company is closing down and not issuing any additional quotes. Our requirement is for the following items: R80-000012-2BK - R80 Single Aircraft Kit - 915MHzFull Spec. - USA includes: One ( 1 ) EA SkyRaider vehicles, Block 2 One ( 1 ) EA front mounted EO/IR payload One ( 1 ) EA SkyRaider base station with battery, spare antennas One ( 1 ) EA Panasonic ToughPad tablet with RaiderOS Four ( 4 ) EA SMART batteries One ( 1 ) EA Four-bay battery charger One ( 1 ) EA battery diverter Two ( 2 ) EA clockwise rotating arms with propellers Two ( 2 ) EA counter-clockwise rotating arms with propellers Two ( 2 ) EA landing legs (w/ antenna) Two ( 2 ) EA landing legs (no antenna) One ( 1 ) EA Osprey payload including 50 mounting plates and 200 zip ties One ( 1 ) EA SkyRaider single case System configured with SkyRaider OS. SRV-01101 - FLIR Five-Day On-site Training session includes: - Up to four (4) students for standard 5-day training session at customer or vendor location. (Reminder need a class to hold a minimum of 10 personnel) KIT-001056 - StormCaster-T Long Range IR Payload SKU-700012-01-01 - HD40 Long Range EO Payload 52.232-18 Availability of Funds. As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. (End of clause)