Building 504 Electrical Outlets
The contractor must provide all materials, labor, and supervision to install electrical infrastructure at Laughlin AFB in a single phase, including trenching, overhead power lines on three new utility poles, and 480-volt receptacles. The work must comply with DoD and electrical codes, and a Stormwater Pollution Prevention Plan is required. A site visit is scheduled for 13 July 2026 at 2:00 pm. The contractor must meet a 128-day Period of Performance, and all quotes must remain valid until 30 September 2026. No budget amount is specified, and funds are not currently available for this effort.