Inactive
Notice ID:FA3099-21-Q-0011
Spofford Cable Network, period of performance 15 May 21 - 14 May 26 12 Month PoP (with 4 option years). Vendor must provide a 20 megabytes per second (Mbps), end-to-end network connection from 581 Lib...
Spofford Cable Network, period of performance 15 May 21 - 14 May 26 12 Month PoP (with 4 option years). Vendor must provide a 20 megabytes per second (Mbps), end-to-end network connection from 581 Liberty Dr, Laughlin AFB, TX 78843 to 14776 Hwy 131, Quemado, TX 78877. The connection will be considered a point-to-point circuit. No internet or ISP data is required. Termination of the circuit at 14776 Hwy 131, Quemado, TX 78877 will be in the government-owned pedestal. The point of demarcation at the delivery points, will ultimately need to be a fiber optic connection as either an LC or SC type connector on single-mode fiber pair. The vendor will need to be able to provide a way to submit trouble tickets for outages to repair the circuit if an outage occurs. See Solicitation Attachment for Full Description