B334 Repair Kitchen Flooring
The 17th Contracting Squadron at Goodfellow AFB, TX requires demolition and replacement of the existing quarry tile system in the kitchen and dishwashing area with a new resinous flooring system, covering approximately 4,984 square feet of flooring and 800 linear feet of cove base. The contractor must complete asbestos testing, comply with environmental protection requirements, and submit SDS sheets, C&D metrics, and waste diversion reports. The period of performance is 164 calendar days after Notice to Proceed, and the project must be coordinated during exodus to minimize downtime. Performance will occur at Fort Griffin Avenue, Building 334, Goodfellow AFB, TX 76908. No budget amount is specified.