The scope of the project is to fully remove the roofing material from the facility. The removal is comprised of a low slope ballasted built-up roof and two steep slope standing seam metal roofs. Remov...
The scope of the project is to fully remove the roofing material from the facility. The removal is comprised of a low slope ballasted built-up roof and two steep slope standing seam metal roofs. Removal of the standing seam will include all support framing and an abandon in place built-up roof below the standing seam. Once the existing roof materials and support framing for the existing standing seam is removed, the entirety of the buildings roof areas will be replaced with a new fleece backed single ply TPO over cover board and tapered insulation. New gutters and downspouts are included with the scope(See attached Specs and Drawings for more detail).