B836 Replace Electrical in Airfield Lighting Vault

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA302226R0021

The contractor must provide all plant, labor, equipment, transportation, and tools to fully replace the components in the Airfield Lighting Vault at Columbus Air Force Base. A site visit is scheduled for 18 Aug 2026 at 9:00 AM CST, with registration required by 7:30 AM CST on 05 Aug 2026, and attendance is highly encouraged but not mandatory. The estimated magnitude of this procurement is between $250,000 and $500,000. Offerors must complete CUI training and return a signed acknowledgment to access drawings and associated documents, with proposals submitted electronically. Note that funds are not presently available, and the Government's obligation is contingent on the future availability of appropriated funds.

B836 Replace Electrical in Airfield Lighting Vault

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA302226R0021

This opportunity requires the contractor to provide all resources for a full replacement of components in an Airfield Lighting Vault. A site visit is scheduled for 18 Aug 2026, with registration required by 7:30 AM CST on 05 Aug 2026. The performance location is Columbus Air Force Base. The estimated budget range for this procurement is between $250,000 and $500,000. Note that funds are not currently available, and the government’s obligation is contingent upon future appropriation.

B836 Replace Electrical in Airfield Lighting Vault

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA302226R0021

This project involves replacing an elevator car, mechanical pump, control systems, and hoist-way doors while reusing the existing hydraulic jack system. A site visit is scheduled for August 18, 2026, at 9:00 AM CST, with registration required by August 5, 2026. The estimated budget for this procurement is between $250,000 and $500,000. Performance will take place at Columbus Air Force Base, and all attendees must present a valid REAL ID-compliant photo ID. Note that funds are not currently available, and the government’s obligation is contingent upon future appropriation.