Repair LRS Hazmat Roof, B155
The contractor must provide all labor, equipment, and materials to design and replace the roof of building 155, including overhangs, at Columbus Air Force Base. The work must eliminate water leaks, prevent ponding, meet ASHRAE insulation requirements, and use a TPO single-ply membrane roofing system. A site visit is scheduled for June 4, 2026, at 9:00 AM CST, with mandatory registration by May 26, 2026. The estimated budget for this procurement is between $300,000 and $500,000. Performance will occur at Columbus AFB, and funds are not currently available for this contract.